BMW 5 series E39

Since 1996-2001 of release

Repair and car operation



BMW E39
+ Introduction
+ The maintenance instruction
+ Current leaving and service
+ The engine
+ Systems of cooling, heating
+ The power supply system and release
+ Engine electric equipment
+ Manual transmission
+ Automatic transmission
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
- Onboard electric equipment
   Diagnostics of malfunctions of an onboard electric equipment - the general information
   Safety locks
   Fusible inserts
   Chain breakers (thermal relays)
   The relay
   Relay check
   Check of lamps накаливания
   Check of electric motors
   Check of electric switches
   Check of switches of lamps and electric motors
   Check of gauges
   Check of the electric motor of a screen wiper
   Stoplight check
   Check of a heater of back glass
   Removal and switch installation
   Removal and installation of the gauge of temperature
   Removal, installation and check of a sound signal
   Remote control initialization by the uniform lock
   Adjustment of range of light of headlights
   Removal and installation of the electric motor of adjustment of range of light
   Replacement of safety locks
   Arrangement of safety locks
   Illumination devices
   Replacement of lamps накаливания
   Removal and headlight installation
   Adjustment of headlights
   Removal and installation of a back lantern
   Monitors
   Removal and installation of the block of the panel of devices
   Replacement of lamps of the block of the panel of devices
   Removal and installation of the switch of signals of turn/screen wiper
   Removal and radio receiver installation
   Screen wiper
   Replacement of brushes of a screen wiper
   Removal, installation and adjustment snuffled стеклоомывателя
   Removal and installation of a drive of a screen wiper/cover
   Removal and installation of the electric motor of a screen wiper
   Check and pump replacement стеклоомывателя
   Work with electric schemes
+ Electric equipment schemes
+ System of onboard diagnostics


Check of switches of lamps and electric motors

 CHECK

1. Remove the corresponding switch.
2. Usual switches have only two joinings. In this case on one of contacts always there should be a pressure (+), and after deenergizing as well on the second. There are switches with several contacts. It is necessary to find out from such switches under the scheme where pressure moves. If necessary it is possible to include ignition.
3. By means of a control lamp check up, whether there is a pressure on the target plug. If pressure is, the switch is serviceable.
4. If on the entrance plug of pressure is not present, there is a breakage in a food cable. By means of the electroscheme it is necessary to check up a wire of pressure and if necessary to replace a wire.