BMW E39
+ Introduction
+ The maintenance instruction
+ Current leaving and service
+ The engine
- Systems of cooling, heating
+ Cooling system
- Heater
Removal and installation of the block of management by a heater or the conditioner
Removal and installation of the gauge of temperature of the block of management by a heater
+ Air conditioner
+ The power supply system and release
+ Engine electric equipment
+ Manual transmission
+ Automatic transmission
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment
+ Electric equipment schemes
+ System of onboard diagnostics
|
Removal and installation of the block of management by a heater or the conditioner
|
1. Расфиксируйте the block of management (1). For this purpose at the left and on the right in the places shown on an accompanying illustration, insert two щупа (2) and press thus spring clips (3).
| Щупы should be inserted precisely in the places shown on an illustration, with application of some force. If the management block thus does not act in film, remove the central console and then displace the block behind. |
|
|
2. Take out the management block. |
3. Расфиксируйте also remove multiitem штекерное connection (1). For this purpose press a stopper (2) downwards and incline a lock collar (3) aside. Address to an accompanying illustration. Thus the switch acts in film upwards. |
|
4. Расфиксируйте others штекерные connections. |
|
|
1. Join and fix штекерное connections. |
2. Establish into place multiitem штекерное connection (1). Connect it by means of the lock lever (3). Fix the lock lever (3). Check up reliability of connection. Address to an accompanying illustration. |
|
3. Establish the management block, having pressed and having fixed it. |
|
|
|