BMW E39
+ Introduction
+ The maintenance instruction
+ Current leaving and service
+ The engine
+ Systems of cooling, heating
- The power supply system and release
+ The power supply system
- System of injection of the petrol engine
Memory of malfunctions
Security measures and rules of observance of cleanliness at work with injection system
Work of system of injection
Check of systems of ignition and injection
Adjustment of a drive of gas
Removal and installation of a branch pipe throttle заслонки
Removal, check and installation of the valve of adjustment of idling
Check, removal and installation of the gauge of temperature
Check of injectors
Removal and installation of injectors
+ The power supply system of the diesel engine
+ System of release of the fulfilled gases
+ Engine electric equipment
+ Manual transmission
+ Automatic transmission
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment
+ Electric equipment schemes
+ System of onboard diagnostics
|
Removal, check and installation of the valve of adjustment of idling
The valve of adjustment of idling is located at the inlet pipeline and connected by a hose to forward and back parts of a branch pipe throttle заслонки.
| For check of working capacity of the valve put a hand on the valve. At the working engine the valve should vibrate owing to clock giving of pressure. |
|
1. Remove a hose of soaked up air from a branch pipe throttle заслонки, preliminary having opened a collar.
2. Disconnect a branch pipe throttle заслонки, address to Section Removal and installation of a branch pipe throttle заслонки.
| Do not disconnect a cable and hoses of a cooling liquid. |
|
3. Turn away directing pipe of the index of level of oil at the holder. |
|
4. Turn away two bolts of fastening of the valve of adjustment at the soaking up pipeline and take out the valve downwards. |
|
5. Расстыкуйте штекерное connection of the valve of adjustment of idling, having compressed a wire clip. Remove a sealing ring and a rubber collar. Disconnect a hose. |
|
Resistance check
|
1. Attach an ohmmeter to tags of the valve of adjustment and check up resistance. Demanded value: (Address to an accompanying illustration).
• the Plug 1 and 3: 40 5 Ohm;
• the Plug 2 and 1 or 2 and 3: 20 5 Ohm. |
|
|
Dynamic check
|
1. Attach tips. |
2. Completely open or close by hand the valve handle. |
|
3. Include ignition. The handle should close cross-section section of the valve half approximately. |
|
|
1. Fix a hose a collar on the management valve. The sealing ring is necessarily replaced with the new. For simplification of installation of a sealing ring grease the case of the valve with vaseline.
2. Insert the valve of management and fix it. Fix the index of level of oil.
3. Join штекерное connection at the valve, address to Section Removal and installation of a branch pipe throttle заслонки.
4. Put on soaking up hose and fix its collar.
5. Consider contents of memory of malfunctions. After elimination of malfunctions clear memory. |
|
|
|