BMW 5 series E39

Since 1996-2001 of release

Repair and car operation



BMW E39
+ Introduction
+ The maintenance instruction
+ Current leaving and service
+ The engine
+ Systems of cooling, heating
- The power supply system and release
   - The power supply system
      Economy of fuel at movement
      Rules of observance of cleanliness at work with fuel system
      Check of the relay of the fuel pump
      Check of productivity of the fuel pump
      Removal and installation of the gauge of a reserve of fuel and the fuel pump
      Removal and installation of the case of the air filter and measuring instrument of weight of air
   + System of injection of the petrol engine
   + The power supply system of the diesel engine
   + System of release of the fulfilled gases
+ Engine electric equipment
+ Manual transmission
+ Automatic transmission
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment
+ Electric equipment schemes
+ System of onboard diagnostics


Removal and installation of the case of the air filter and measuring instrument of weight of air

 REMOVAL

1. Remove a measuring instrument of weight of air. For this purpose turn маховичок at the tip (3) to the left and remove. Open a collar in a point (1) at an air hose. Clips (2) open a screw-driver outside. Address to an accompanying illustration.

2. Turn away a bolt (1) and pull the case of the air filter from a soaking up branch pipe (2) and a rubber support (3) a little. Address to an accompanying illustration.

3. Turn away bolts of fastening and remove an additional tank (arrows on an accompanying illustration) from a box of the air filter.

Installation

The air filter of models 520i, 523i, 528i:

1 — an additional tank
2 — a filter box
3 — a rubber support
4 — a soaking up branch pipe
5 — a collar

6 — a clip
7 — a sealing ring
8 — a filtering element of the air filter
9 — basic frameworks


 INSTALLATION

1. Fix an additional tank
2. Insert the case of the air filter with the bottom rubber support. Thus join soaking up branch pipe at a body wing. Fix bolts.
3. Insert a measuring instrument of weight of air with a sealing ring and fix its clip.
4. Put on an air hose of the inlet pipeline at a measuring instrument of weight of air and fix its collars.
5. Join штекерное connection of a measuring instrument of weight of air and turn маховичок to the right.