BMW 5 series E39

Since 1996-2001 of release

Repair and car operation



BMW E39
+ Introduction
+ The maintenance instruction
+ Current leaving and service
+ The engine
+ Systems of cooling, heating
+ The power supply system and release
- Engine electric equipment
   - Ignition system
      Security measures at work with ignition system
      Removal and installation of the coil of ignition
      Removal and installation of the gauge of a detonation
      Check and replacement of the gauge of impulses
      Removal and installation of the tip of a spark plug
      Removal and installation of the block of management DME
      Spark plugs
   + System of preheat of the diesel engine
   + Charge and start systems
+ Manual transmission
+ Automatic transmission
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment
+ Electric equipment schemes
+ System of onboard diagnostics


Removal and installation of the gauge of a detonation

REMOVAL

1. Remove the inlet pipeline, address to Section Removal and installation of the inlet pipeline.

2. Расстыкуйте штекерное connection (1). Address to an accompanying illustration.

Arrangement of tips of cables under the inlet pipeline, looking in front:
1 — the tip of the gauge of a detonation (is closed)
2 — the pulse gauge of a cranked shaft
3 — the gauge of recognition of the cylinder

3. Turn out the detonation gauge. In the block of cylinders is available two gauges. Address to an accompanying illustration.

Do not mix gauges at installation. It can lead to engine damage. For this purpose mark joinings and position of gauges.


INSTALLATION

1. Carefully clear adjoining surfaces of the block of cylinders/gauges of a detonation.
2. Fix the gauge of a detonation the moment of 20 Nanometers.

Observe the inhaling moment, since. It is important for correct work of the gauge of a detonation. At installation of gauges watch cleanliness.

3. Join штекерные connections and fix them in holders.
4. Establish the inlet pipeline, address to Section Removal and installation of the inlet pipeline.
5. Attach a weight cable to the storage battery. Establish hours. Program radio receiver stations.