      Турбокомпрессор
      System рециркуляции the fulfilled gases (system EGR)
      The device of heating of the fuel filter
      Removal of air from fuel system
      Check, removal and installation fuel запорного the valve
      Removal and installation of atomizers
      Check and adjustment of the moment of the beginning of injection
      Removal and installation of the inlet pipeline
   + System of release of the fulfilled gases
+ Engine electric equipment
+ Manual transmission
+ Automatic transmission
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment
+ Electric equipment schemes
+ System of onboard diagnostics


Check, removal and installation fuel запорного the valve

Electromagnetic fuel запорный the valve at ТНВД opens fuel giving at ignition inclusion. It is necessary for checking up, if the engine is not started or after ignition deenergizing does not stop.

 CHECK

1. Switch on and off the ignition lock on a steering wheel. The electromagnetic valve thus should click distinctly.
2. If click is not present, disconnect an electric wire. Put a cable of the storage battery to the stopping delivery valve.
3. If now click is audible, check up a chain. If necessary replace wires. If the malfunction source is not found, replace the valve.
4. At work with fuel system observe cleanliness, address to Section of the Rule of observance of cleanliness at work with fuel system.


 REMOVAL

Disconnect a cable and turn out the valve of a stopping delivery (1). Address to an accompanying illustration.


 INSTALLATION

1. Remove the piston and a spring of the valve and insert them into other valve. Watch correct position of a sealing ring.
2. Screw the new valve and tighten its moment of 20 Nanometers. Fix a cable.