BMW E39
+ Introduction
+ The maintenance instruction
+ Current leaving and service
+ The engine
+ Systems of cooling, heating
+ The power supply system and release
- Engine electric equipment
+ Ignition system
+ System of preheat of the diesel engine
- Charge and start systems
Removal and installation of the storage battery
The maloobsluzhivaemaja storage battery
Check of the storage battery
The self-category of the storage battery
Gymnastics of the storage battery
The generator - the general data
Security measures at work with the generator
Check of pressure of gymnastics of the generator
Removal and generator installation
Check and replacement of brushes of the generator and pressure regulator
Starter
Removal and starter installation
Removal, check and installation of the electromagnetic traction relay
+ Manual transmission
+ Automatic transmission
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment
+ Electric equipment schemes
+ System of onboard diagnostics
|
Removal and starter installation
The starter is sideways, at a plane of connection of the block of cylinders and a check point.
|
1. Disconnect a cable of weight from the storage battery. The battery is located in a luggage carrier behind the right lateral facing. |
|
2. Заизолируйте a tape the plug of the cable going to a negative pole of the storage battery to exclude casual contact. |
3. Remove back bottom facing of an impellent compartment, address to Section Removal and installation of the bottom guard of an impellent compartment. |
4. Disconnect following wires: 1 - plugs 30 from a positive pole of the storage battery; 2 - plugs 50 from the ignition switch. |
|
| Mark a lining of wires not to be mistaken at assemblage. |
|
5. Turn out bolts of fastening of a starter from outside a check point by means of the extension piece. |
6. Take out a starter. |
|
|
1. Check up a gear wheel of a drive of a starter and a gear wreath of a flywheel. Address to an accompanying illustration. |
|
2. Establish a starter and fix bolts of fastening by the moment of 50 Nanometers. |
3. Fix a wire at the plug 30 moment of 10 Nanometers, at the plug 50 moment of 5 Nanometers. |
| Wires lay according to the marks put at a detachment. Watch that they did not fray about adjacent designs. |
|
4. Establish back bottom facing of an impellent compartment, address to Section Removal and installation of the bottom guard of an impellent compartment. |
5. Attach a weight cable to the storage battery. Establish hours, program radio receiver stations. |
|
|
|